Project: Voltar-S21   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Vern Little   -  
Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:2341.9
Start/Last Date:Mar 06, 2018 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=Voltar-S21

Home or Last Project Picture

Mar 28, 2021     Fitting header tank - (2 hours)       Category: Fuselage
Riveted tank support in place. Marked and drilled for sump drain. Installed tank portion of sump drain fittings. Enlarged sump drain hole to 1-3/4” using carbide bit in rotary tool and half round file. This allows the large nut on the sump drain fitting to fit through the floor.

Instructions are cryptic/missing, in some cases refer to non-existing parts. Probably a residue from Rotax instructions.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.